Section 104 Agreement Wessex Water

Section 104 Agreement Wessex Water: Everything You Need to Know

Are you planning to develop a property that requires a new or modified sewerage system? If so, you need to know about Section 104 agreement Wessex Water. This agreement is required by UK law and must be obtained before any site work begins.

In this article, we`ll cover everything you need to know about Section 104 agreement Wessex Water, including the definition, its importance, and what it entails.

What is a Section 104 Agreement?

A Section 104 agreement is a legal agreement between a developer and the local water authority, in this case, Wessex Water. The agreement outlines the developer`s responsibilities for the design, construction, and adoption of a new or modified sewerage system.

The purpose of the agreement is to ensure that the sewerage system complies with the local water authority`s standards and regulations. It also ensures that the system is designed and constructed in a manner that enables it to be easily maintained and repaired.

Why is a Section 104 Agreement Important?

A Section 104 agreement is crucial for developers because it ensures that the sewerage system construction or modification is performed correctly. The agreement also ensures that the sewerage system complies with the local water authority`s standards, meaning that it will operate safely and efficiently.

Failing to obtain a Section 104 agreement before commencing site work could result in the local water authority rejecting the sewerage system. This would cause delays in the construction process, which could be costly and time-consuming.

What Does a Section 104 Agreement Entail?

To obtain a Section 104 agreement Wessex Water, you must first submit an application. The application must include the following information:

– Details of the proposed development

– Drawings of the proposed sewerage system

– A drainage strategy report

– A design and construction report

– A detailed description of the proposed connection to the existing sewerage system.

After submitting the application, Wessex Water will review the information and provide feedback. Once the sewerage system design and construction meet the standards, the developer will sign the agreement. After the agreement is signed, the developer is responsible for constructing the sewerage system in accordance with the agreement.

After the sewerage system is constructed, Wessex Water will inspect it to ensure that it complies with the standards and regulations. If the system meets the requirements, Wessex Water will adopt it, and the developer`s responsibility for maintenance and repair will end.

In Conclusion

A Section 104 agreement Wessex Water is a crucial legal requirement for developers planning to build or modify a sewerage system. It ensures that the system is designed and constructed in compliance with the local water authority`s standards and regulations. Failing to obtain a Section 104 agreement before commencing site work could result in delays and increased costs. Therefore, it is essential to follow the guidelines and obtain the agreement before starting the construction process.